Call us: +44 (0)1920 871403
We Lay Anything!

Projects

EPL&R have been involved in numerous projects: please see some listed below



The O2 building

A new road layout was to be constructed around the grounds of the O2 centre
The client VolkerFitpatrick Ltd at the O2 building in East London requested the divertion of the existing 125mm MP gas supply.


Westfields Shopping Centre, Shepherds Bush

The Marks and Spencers retail outlet situated at the recently built Westfield shopping centre in Shepherds Bush outgrew their premises and decided to increase the floor space by extending upwards another two floors on top of the existing shopping area. This posed problems and required the existing gas pipes running across the roof space to be relocated without disrupting the whole shopping centre.

EPL&R were consulted on the solutions to the problem and were able to coordinate the expertise and make the solution a reality, the work was carried out over two Sunday nights to cause least disruption to the tenants of westfields.


Fulham Football Club

EPL&R  installed and commissioned a new gas supply to Fulham Football Clubs ground at Craven Cottage. A new 125mm supply was connected to an existing 6” main to feed the renovated building next to the dressing rooms at the club.


Barham Manor Estate

Tasked to install and commission 2 kilometres of 180mm pipework to bring a supply of gas from the National grid through the grounds of the estate to supply the manor house and 8 properties throughout the estate.


Great Weston Corner West London

Situated close to Chiswick in sight of the M4 elevated section the developers have constructed some art deco buildings with a modern new build. EPL&R Laid 250mm PE pipe to connect up with the newly installed 8” steel pipe, supplying the new complex and luxury tower block. National Grid later installed an MP reinforcement supply leaving a governor nearside footway. EPL&R were tasked to carry out a valve operation, cut & cap previously laid supply and run new supply keeping the buildings with positive pressure throughout. Consultation with Barrett’s, NG and GTC working together and ensure least disruption to the whole complex.


Felsted Public School Felsted Essex

The school decided to improve their internal road layout and tasked EPL&R to carry out the improvement works. A completely new section of roadway was built through the grounds which provided the school with the much improved traffic system.


Tesco, Sewardstone Road, Waltham Abbey Herts

EPL&R were contracted to disconnect the existing 90mm low pressure supply feeding the Tesco premises in Waltham Abbey. Also to construct and commission a new commercial 90mm low pressure supply from the National Grid 250mm main.

Tesco Unit, Roman Place, Bow, London E3

Install and commission new 125mm low pressure supply to newly constructed Tesco unit.


Former Parkbay Garden Centre, Paingnton, Devon

Supply new infrastructure installing and commissioning 35m of main in the highway and 600m on site main to supply 91 new domestic dwellings 24 x 2 bedroom houses, 51 x 3 bedroom houses, 14 x 4 bedroom houses and 2 x 5 bedroom houses.